INTERIOR AND EXTERIOR RENOVATIONS OF MR. BILL’S SEAFOOD: A FAT CRAB CAFÉ

This project consisted of major interior and exterior renovations to accommodate a retail seafood sales area, cooking kitchen and prep kitchen, walk in refrigeration and freezer equipment, and café with patio for outdoor dining area. A unique structure was also added to support the outdoor steamer and retort for Crab World to expand the steamed seafood operation.

   

The existing building is a wood frame structure with wood trusses. The addition is structural steel with laminated beam construction. Other specialties included polished concrete floors, interior vinyl panel walls and subway tile walls.

Pre-Construction Services

  • Project Budgeting
  • MEP Design and Engineering

Construction Services

  • Demolition
  • Site excavation, grading, and Storm sewer
  • Building addition and renovation
  • Parking lot and lighting
  • Curbs, sidewalks and walkways
  • Public water, sewer, natural gas, and electric connections